Staffed with over 70 years experience. Crane & Rigging Equipment Contractors Contact Us   1-800-854-8066
Home Equipment Inventory FAQs Client Testimonials Sample Projects Employment Links
Services



Crane Rigging

Forklift Services

Heavy Equipment Moving & Relocation

Turnkey Relocation Services

Storage, Crating & Shipping Services

Request a Quote


General Electric Company

All American Rigging was contracted in 1993 by General Electric to perform swap out rigging of 73 1500 KVA PCB filled transformers of the J.T. Deeley Power Plant in San Antonio, Texas. All American Rigging designed, engineered and constructed a lifting cage for protection of units during hoisting and containment of any possible fluid leakage.

Transformers rigged out of top floors of 2 units one at a time and staged outside for changing out top hats and removal of fluids.

 

[return to top]

[back to Sample Projects]

 


Crane Rigging & Equipment Contractors
80 South Belt Industrial Drive • Houston • Texas • 77047
toll free: 1.800.854.8066 • phone: 713.433.6359 • fax: 713.433.0515

[Home] [Equipment Inventory] [FAQs] [Client Testimonials] [Sample Projects] [Employment] [Links] [Contact Us]

[Crane Rigging] [Forklift Services] [Heavy Equipment Moving & Relocation]
[Turnkey Relocation Services] [Storage, Crating & Shipping Services] [Request a Quote]

Copyright © 2001-2002, Crane Rigging & Equipment Contractors. All rights reserved.
Site created and marketed by Vision Masters Web Site Design